ADU contractors: what licenses to look for
By Contractor Lookout · Updated November 3, 2026
To build an accessory dwelling unit (ADU) in California, hire a contractor with a B General Building license. If your ADU is a manufactured home built off site, a C-47 General Manufactured Housing contractor can install it.
That’s the guidance in CSLB’s Fast Facts sheet “Tips for Building a Residential ADU” (revised November 2025). CSLB also notes that other C specialty contractors generally can’t manage a full ADU build.
Which license fits your ADU
| Type of ADU project | License to look for |
|---|---|
| ADU built on site | B General Building |
| Manufactured home built off site and installed as an ADU | C-47 General Manufactured Housing |
| One trade within the ADU, such as electrical or plumbing | The C specialty for that trade, working under or alongside the main contractor |
In CSLB’s current file, 107,757 licenses hold the B class and 459 hold the C-47.
A specialty contractor still has a place on an ADU job. Your B contractor may subcontract the electrical work to a C-10 or the plumbing to a C-36. What CSLB’s sheet rules out, generally, is a single-trade specialty contractor managing the whole build.
Why the B fits
Under BPC 7057, a B contractor can take a prime contract that involves at least two unrelated trades besides framing or carpentry. An ADU involves many trades, so it fits the B. Our A vs B vs C guide explains the rule in more detail.
ADU work is home improvement
CSLB treats building an ADU as a home improvement project. That brings in the home improvement contract rules:
- A written contract is required. Home improvement contracts over $500 must be in writing (BPC 7159).
- The down payment is capped. CSLB’s ADU sheet puts it simply: the down payment can’t exceed $1,000. The statute, BPC 7159.5, says $1,000 or 10% of the price, whichever is less. For any contract of $10,000 or more, 10% is at least $1,000, so the cap is $1,000.
- Payments follow the work. After the down payment, payments can’t exceed the value of the work performed.
- You can cancel. You generally have 3 business days to cancel, 5 if you’re 65 or older, and 7 in disaster areas (Civil Code 1689.6).
One exception: a contractor with a qualifying blanket performance and payment bond on file can lawfully take more up front. The license record shows this as a secondary note. See our down payment guide and the status hub.
Permits
Your city or county issues building permits for an ADU. For a manufactured ADU, CSLB notes that the state Department of Housing and Community Development (HCD) may issue the permits instead.
Before work starts:
- Ask the contractor who will apply for the permits.
- Get copies of the issued permits.
- Make sure inspections are scheduled at the stages your permit requires.
A licensed contractor is needed for an ADU regardless of price. The minor work exemption only covers jobs under $1,000 that need no building permit. See the minor work exemption.
How to check an ADU contractor
- Get the license number and look it up with our search, then confirm the live record on CSLB’s Instant License Check. Our data is a weekly file, so the live record is the one to trust.
- Confirm the class. Look for B, or C-47 for a manufactured unit.
- Check the primary status is Clear and read any secondary notes. Our status guide explains each one.
- Confirm the $25,000 contractor’s bond with the surety. See contractor bonds explained.
- Check workers’ comp. If the license shows “Exempt,” ask who will do the work. An exemption is only for contractors with no employees. See how to check workers’ comp.
- Check the expiration date. A license runs for two years from the last day of the month it was issued, so make sure it won’t lapse mid-project without renewal.
- Check the salesperson’s HIS registration if someone other than the contractor sold you the job.
To compare general contractors in one city, start with a page such as general contractors in Los Angeles, or browse the counties and cities index.
For every step before you sign, see our hiring checklist.
This is general information, not legal advice.
Sources
- CSLB Fast Facts, Tips for Building a Residential ADU (Rev. 11/2025): https://www.cslb.ca.gov/Resources/GuidesAndPublications/2025/FastFacts_ADU.pdf
- BPC 7057: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC§ionNum=7057
- BPC 7159: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC§ionNum=7159
- BPC 7159.5: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC§ionNum=7159.5
- Civil Code 1689.6: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV§ionNum=1689.6
- BPC 7140: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC§ionNum=7140
- BPC 7048: https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=BPC§ionNum=7048